|
|||||||||||||||||
|
ISLAND
WASTEWATER TREATMENT PLANT UPGRADE - LAKE HAVASU CITY, ARIZONA
The Island Wastewater Treatment Plant project consisted of constructing a new covered aerobic digester with mixing, aeration and odor control, replacement of the waste activated sludge pumps, construction of a new electrical building, expanding the existing blower building, replacing an aeration blower, replacing the irrigation pump station, installing a new emergency generator and upgrading the entire electrical system at the plant. Under the same contract, the nearby Mulberry Waste Water Treatment Plant project consisted of the installation of the permanent emergency generator, including any clearing and grubbing, excavation, concrete slab installation, electrical ductbank, electrical connections, programming, start-up and testing. Total project cost was $7,095,500.00. The project was completed on time and budget in March of 2007.
Project Manager - Shane Harris
Owner - Lake Havasu City - www.lhcaz.gov/ww
| |||||||||||||||||
|
|