

SPECIALISTS IN WATER AND WASTEWATER TREATMENT PLANTS

TIMPANOGOS SPECIAL SERVICE DISTRICT - THERMAL DRYER

Alder Construction is constructing a new biosolids thermal drying facility at the Timpanogos Special Service District as part of a multi-phase upgrade to the District’s solids handling program.
The Thermal Dryer Project will convert dewatered biosolids into a dried, pelletized product, significantly reducing volume and creating a more manageable and reusable end product. The facility includes a fully integrated building housing specialized drying equipment and supporting systems.
Major elements of the project include:
-
Construction of a new multi-area Thermal Dryer Building, including:
-
Hopper storage and feed systems
-
Thermal dryer process rooms
-
Boiler systems and heat exchange infrastructure
-
Electrical control (MCC) and operations spaces
-
-
Installation and assembly of thermal drying equipment, including dual dryer trains and conveyance systems
-
Structural platforms, catwalks, and maintenance access systems
-
Construction of a biosolids storage silo and truck loadout facilities, including a truck scale system
-
Site civil improvements, including deep foundations, yard piping, and utility connections
-
Installation of advanced odor control systems, including carbon adsorption and chemical scrubber systems
The project integrates pre-purchased, vendor-supplied process equipment with site-built infrastructure, requiring precise coordination between trades, suppliers, and engineers.
Once complete, the thermal drying facility will significantly reduce biosolids disposal costs and support the District’s goal of producing a Class A biosolids product.



